Student Medical & Counseling Center- Medical Grade Air Distribution
Central Washington University
400 East University Way
Ellensburg 98926
Amount Requested: $2,000,000
The CWU Student Medical & Counseling Center was built in 1970 and has never had any major renovations or expansions, including the original heating/ventilation/air conditioning (HVAC) system. Even prior to the medical demands associated with the pandemic, this facility was often very crowded. There is only one general return-air system for the entire building and the current HVAC system does not meet current standards. Additionally, the system cannot accommodate weather extremes—lab equipment shuts down in extreme heat and parts of the building that can’t be properly heated must be taken offline in the winter. This funding will make it possible to install a new HVAC system.
A new medical grade air distribution system will reduce the spread of airborne pathogens, benefiting the health of students, staff, and the greater Ellensburg community. Additionally, a new system will be more cost and energy efficient than the current system which is prone to mechanical failures and costly repairs.
Rep. Schrier’s Financial Disclosure Document